Planking was coming along nicely.
However...

It was time to install the horizontal surfaces.


[IMAGE] The hull was now up 34" from the sheer. All the vertical surfaces had been marked for the horizontal heights. Triangular blocking was installed above the lines, allowing room for the 1/2" plywood, then the berthtops and countertops were installed from below. Outer edges were trimmed to fit the hull.  
 
 
 
 
 
 
 
 
 

[IMAGE]

There were a few "exciting" moments when it came time to stuff the forward cabin berthtop down through the framing. But, I knew from building the model that it could be done.


Speaking of models... [990612almostkeeltime120x90.jpg]

[home2.jpg][chaos]


Copywrite © Alan "Maddog!" MacBride 1999